Groundwater is a vital resource for many businesses, including agriculture, as well as for household consumption. The Uttar Pradesh government has established requirements for getting a Ground Water No Objection Certificate (NOC) in order to control and manage this vital resource. The Uttar Pradesh Ground Water Department (UPGWD) has established precise guidelines that you must adhere to if you intend to extract groundwater in Uttar Pradesh for any reason.
This blog will walk you through the requirements for eligibility, paperwork, and other steps in order to obtain a UPGWD NOC.
It's critical to comprehend the need for a groundwater NOC before diving into the requirements. Because of over-extraction, groundwater levels in Uttar Pradesh have been dropping alarmingly quickly. By ensuring that water extraction is done sustainably, the Ground Water NOC helps to avoid excessive depletion and environmental harm.
The NOC is mandatory for:
Without a proper NOC, groundwater extraction is illegal and may lead to penalties and legal action.
The Uttar Pradesh Ground Water Department categorizes projects into different sectors that require a NOC. These include:
Each type of project has its own specific criteria and application process.
Only after meeting certain qualifications can one receive an Uttar Pradesh Ground Water NOC. These vary based on the type of project and the location of the groundwater extraction. A few of the essential components are:
Your project's need for groundwater is a major factor in determining whether it qualifies for a NOC. Large-scale infrastructure and industrial projects must submit a thorough water use plan. The plan should include techniques for gradually lowering water usage as well as the daily, monthly, and annual water needs.
Large-scale water-consuming projects need to install groundwater recharge systems in order to guarantee sustainable water use. The groundwater that is removed is replenished in part by these systems. One typical way to do this is by rainwater collection, which the UPGWD mandates be included in the design of infrastructure projects and companies.
Larger projects, such as mining or industrial operations, could need an Environmental Impact Assessment (EIA). The environmental effects of groundwater extraction are assessed in this report, along with their implications for neighboring communities, local ecosystems, and the availability of water for other users. In several industries, an EIA report is frequently required to be submitted with your NOC application.
Another consideration is the distance from any current tubewells or borewells. Obtaining a NOC for your project could be more difficult if it is near other locations where water is extracted, as the combined extraction might have an adverse effect on groundwater levels. The UPGWD evaluates if there is sufficient groundwater available for your project without interfering with the activities of adjacent users.
Your application for a UPGWD NOC requires the submission of a large number of papers. Depending on the kind of project, these differ slightly, however, the main documents often consist of:
A thorough project report that describes your groundwater use's goals, location, and extent. Your daily water usage, water requirements, and the integration of groundwater recharge techniques should all be highlighted in this report.
A map indicating the precise location of the water extraction site is crucial. In order to demonstrate that you have the authority to legally draw groundwater from the designated location, you will also need to present lease agreements or proof of land ownership.
A water balance chart shows how much water your project has used overall. This covers the volume of water that is extracted, reused, and released. The water balance ought to show how sustainably and efficiently the project uses water.
You must submit a rainwater harvesting plan outlining the structures you propose to develop, their capacities, and the amount of water you anticipate they will recharge into the aquifer since groundwater recharging is required.
You will also need to get a consent to establish and operate from the State Pollution Control Board for industrial and large-scale infrastructure projects. This guarantees that your project won't produce hazardous emissions and will comply with environmental standards.
Once you have the necessary documents and meet the eligibility criteria, you can begin the application process for the UPGWD NOC. Here are the steps involved:
Fill out the necessary groundwater extraction form by going to the UP Ground Water Department's web portal. Please include all required papers, such as water balance sheets, maps, and project reports.
There is an application processing charge that you must pay. The size and nature of the project determine the pricing schedule. Obtain a receipt for your payment; these will be needed in order to proceed.
The project location will be inspected by representatives of the Uttar Pradesh Ground Water Department after your application has been submitted. They'll evaluate the site, confirm the paperwork, and see if the suggested extraction of groundwater is feasible.
The groundwater NOC will be issued by the UPGWD if everything is in order. After receiving an official certificate, you will be able to legally extract groundwater for your project as long as the requirements are met.
Generally speaking, the NOC is good for a certain amount of time, depending on the kind of project. It lasts for three to five years for the majority of industrial or infrastructure projects. Following this time frame, you will have to demonstrate that your project still satisfies the sustainability requirements in order to renew the NOC.
For Registration Visit: UP Ground Water Department Certificate
For every project that calls for the extraction of groundwater, obtaining an Uttar Pradesh Groundwater NOC is essential. The main goals of the criteria are to guarantee sustainable usage and avoid over-extraction of this valuable resource. You can obtain a NOC and support responsible water management by being aware of the qualifying conditions, gathering the required paperwork, and completing the application process. Make sure your project complies with all UPGWD requirements in order to stay in compliance and stay out of trouble. Every action taken now will contribute to the preservation of this resource for future generations, as sustainable groundwater usage is essential for the future.
Services for Uttar Pradesh Ground Water NOC Registration are provided without difficulty by MetaCorp ITES Pvt. Ltd. We help companies get the No Objection Certificate (NOC) that they need to extract groundwater from the Ground Water Department. Our staff manages every step of the procedure, from approval to documentation, making sure all rules are followed. With our experience, you may avoid legal problems and swiftly and effectively safeguard your NOC. For smooth NOC registration services in Uttar Pradesh, put your trust in MetaCorp ITES.
We are the pioneers in offering environmental consulting services to our patrons, giving us the first mover advantage & keeping us ahead of our competitors.
Very experienced in filing, monitoring & issuance of CTE, CTO, Waste Management Authorization from State Pollution Control Boards